I have to say, he's done a great job with the plastic wrap (what we call visqueen down in Louisiana) so the plaster dust hasn't reached most of the rest of the house. We're still using 100% of the kitchen, so no pain yet on that score.
Though I'm publishing this in June, most of this work was done in March/April while it was still cool outside so I used the lathe for firewood on the patio. It burns really, really well which is a bit concerning.
We've been watching Chip and Joanna Gaines' "Fixer Upper" as a family. It's about the only thing we all like. Funny, huh?
![]() |
NW view, bathroom door on right side, will be moved to open near the window on the left |
![]() |
West view. The dining room is on the other side of this wall. That window is large so the cabinets we want to install on this wall will have to be very shallow. |